Platform

Scenario Comparator

TCO
ISO 55000
max 3 active

Baseline

$3.82M

20yr · 5% · $95/hr · heavy freight

Optimized Strategy

$3.64M

20yr · 5% · $95/hr · heavy freight

Select a scenario pill above to add (1 slot free)

Annual Cost + Cumulative Overlay

KPI & Parameter Comparison

MetricBaseline Optimized Strategy
Total TCO$3.82M$3.64M
Annual O&M$51k$42k
Cost/km$0.80$0.76
Labor Rate$95/hr$95/hr
Maint Interval ×1.2×
Failure Rate ×0.9×
Extra Warranty0 yr2 yr
InflationOffOn
Downtime CostsIncluded
Profileheavy freightheavy freight

Cumulative Delta vs Baseline